Dhekelia Power Station Phase II (1987-1988) & Phase III (1991-1992)

Erectors George Leventis & George Konnafis on the laced columns ready to receive the Roof Truss
Connecting to the Existing Station
Connecting the Turbine Hall Floor Beams
Erector George Leventis ready to connect the truss to the laced column
Erectors Leventis, Vasos and crane operator Michalis preparing to lift the Plate Girder
Erectors Leventis and Konnafis waiting to receive the Plate Girder
Boiler Side Roof and Floor Steel
Boiler Side Roof Steel
Office Side Floor and Roof Steel
Office Side Ground Floor
Turbine Hall with 100Tonne Crane Gantry Girder in position
Boiler Side Steel Completed
The Completed Steel Frame Erected. In the backround the 100T Traveling Crane
Erector Vasos on the roof of the Water Treatment Building